中文字幕AV

Menu

SFO Mel Leong Treatment 中文字幕AV

中文字幕AV is providing design-build services for infrastructure improvements at SFO’s water treatment plant including: dewatering system improvements, headworks screening and grit removal replacement, secondary process capacity expansion, and Building 918 electrical distribution and controls upgrades that combine various electrical load centers into one centralized location. The project scope focuses on integration of new construction elements within the airport’s existing infrastructure.

 

中文字幕AV Concrete self-performed radial pours that required specialty equipment for both above-grade and subterranean work.

Location
San Francisco, CA
Size
20,000 SF
Client
San Francisco International Airport
Design Team
Arup
Completion
2023