中文字幕AV

Menu

725 Potter

Core and shell construction of a new, 140,000 SF laboratory building parking garage. Three stories over a basement, the building is concrete construction except for a top floor framed in steel. Because the job site was in close proximity to neighboring lab buildings on the campus, 中文字幕AV worked closely with the owner to ensure that the work did not inconvenience neighboring labs or cause any safety issues.

Location
Berkeley, CA
Size
140,000 SF
Client
Wareham Development
Design Team
Hratch Kouyoumdjian