Life Science – 中文字幕AV, L.P. Tue, 27 Feb 2024 01:25:38 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.3 Bakar BioEnginuity Hub /projects/bakar-bioenginuity-hub/?utm_source=rss&utm_medium=rss&utm_campaign=bakar-bioenginuity-hub Fri, 20 Dec 2019 20:03:20 +0000 /?post_type=projects&p=1863 中文字幕AV provided GC services for the Bakar BioEnginuity Hub at UC Berkeley by creating research facility space and seismically rejuvenating the 47-year-old University Art Museum. The project scope included construction of a full-service life science incubator which included private labs for enterprises desiring more dedicated space, and wet and dry open lab benches for faculty and student researchers. Work also included a single-story, glass-enclosed addition, which adds 6,600 SF of office space to support the research function. 中文字幕AV self-performed exterior building preservation, fencing, and grouting, which was painstakingly installed to a high level of architectural detail. The project achieved LEED Gold certification.

 

Within the 40,000 SF incubator is the provision of extensive equipment and laboratory space so that teams can test, develop, and grow their game-changing ideas. Fledgling ventures can lease as little as a single lab bench or half of a freezer shelf, while larger companies can access state-of-the-art equipment for the fields of therapeutics, diagnostics, research tools, agriculture and food tech, and more.

]]>
Stanford University Sapp Center for Science Teaching and Learning /projects/stanford-university-sapp-center-for-science-teaching-and-learning/?utm_source=rss&utm_medium=rss&utm_campaign=stanford-university-sapp-center-for-science-teaching-and-learning Thu, 17 Dec 2015 02:14:43 +0000 /?post_type=projects&p=1224 中文字幕AV provided design-build services for the historical renovation, seismic upgrade, and expansion of one of the oldest buildings at Stanford University. Originally built in 1902, the four-story building is a key component of the university鈥檚 long-range vision to create a new biology/chemistry quad on campus. The sandstone structure features state-of-the-art bio/chemistry and organic chemistry teaching laboratories, along with a new library combining biology, chemistry, statistics and mathematics. An underground addition contains a lecture hall and a 300-person auditorium with a walkout terrace above. The team also performed the installation of site utilities and a filtration basin along Lomita Drive. The project achieved LEED Gold certification.

]]>
UCSF Clinical Science Building /projects/ucsf-clinical-science-building/?utm_source=rss&utm_medium=rss&utm_campaign=ucsf-clinical-science-building Tue, 26 Dec 2017 23:55:50 +0000 /?post_type=projects&p=1688 The scope of work on this historic, 109,000 SF building for future classroom, meeting, and academic work space included demolition and abatement; seismic upgrades; historic restoration; a new entry way; interior construction including MEP, data and telecommunications cabling; building site landscape; and FF&E. Construction took space on the busy UCSF Parnassus campus next to an active medical center. The project achieved LEED Gold certification.

]]>
UOP Arthur A. Dugoni School of Dentistry /projects/uop-arthur-a-dugoni-school-of-dentistry/?utm_source=rss&utm_medium=rss&utm_campaign=uop-arthur-a-dugoni-school-of-dentistry Wed, 10 Sep 2014 23:51:08 +0000 /?post_type=projects&p=580 Conversion of the former Wells Fargo Data Center in downtown San Francisco into the new Arthur A. Dugoni School of Dentistry. The dental school occupies approximately 225,000 SF of the building and features interactive classrooms, clinical examination floors, and offices. The remainder of the building is being leased to outside tenants.

 

The construction scope involved replacement of the exterior cladding with new high-performance glazing; reconfiguration of the building entry to make it more visible and inviting to pedestrian traffic; installation of escalators between the first and second floors to bring dental patients to the clinical floors; all new MEPFS systems; and state-of-the-art dental equipment for research, teaching, and training. The project achieved LEED Gold certification.

]]>
Town School for Boys /projects/town-school-for-boys/?utm_source=rss&utm_medium=rss&utm_campaign=town-school-for-boys Thu, 15 Jun 2023 20:38:28 +0000 /?post_type=projects&p=3191 中文字幕AV has completed several projects since 1995 at the private K-8 Town School for Boys, including a interiors and exterior improvements in 2008, a theater and gym in 2018, and most recently an engineering space.

 

In 2023, the team completed the conversion of two existing classroom spaces into an engineering laboratory with a school-wide curriculum focused on STEAM and project-based learning. The new approximately 1,400 SF lab allows students to engineer and create real-world projects in wood, metal, plastics, electronics and robotics, using 3D printers, a CNC machine, laser cutters, a drill press and a bandsaw. Concurrent with the lab’s transformation, the remainder of the first floor renovation includes four additional classrooms, three offices, and two gender-neutral restrooms.

 

In 2018, 中文字幕AV completed the Dolby Family Center, which included a 7,500 SF gymnasium and theater. The flexible space transforms from a gym and basketball court into a 420-seat, state-of-the-art performing arts auditorium that includes retractable seating, wall-mounted acoustic banners, architectural wood panel proscenium, LED lighting system, and surround sound technology. Additional scope included adding a second floor mezzanine and catwalk that overlooks the space below.

 

In 2008, 中文字幕AV performed interior and exterior improvements including the relocation of second grade classrooms, music and reading rooms, offices, and ADA upgrades. Exterior scope included new structural supports for the safety barrier netting on two rooftop playing fields, a synthetic turf system at the lower play field, and a playground structure.

]]>
5000 Marina Boulevard /projects/5000-marina-boulevard/?utm_source=rss&utm_medium=rss&utm_campaign=5000-marina-boulevard Thu, 29 Dec 2016 16:44:31 +0000 /?post_type=projects&p=1560 中文字幕AV modified the interior of four floors in this 60,000 SF building including adding new restrooms and showers, a new lobby, design-build MEP, and full tenant improvement build-out for the bio-medical company Ultragenix.聽The exterior work consisted of replacement of Vista wall facade panels with glazing to open up views to San Francisco and the Bay. A new exterior canopy and entry ramps, landscaping and building signage, and exterior paint were also added.

]]>
725 Potter /projects/725-potter-2/?utm_source=rss&utm_medium=rss&utm_campaign=725-potter-2 Fri, 17 Mar 2023 01:03:30 +0000 /?post_type=projects&p=2919 Core and shell construction of a new, 140,000 SF laboratory building parking garage. Three stories over a basement, the building is concrete construction except for a top floor framed in steel. Because the job site was in close proximity to neighboring lab buildings on the campus, 中文字幕AV worked closely with the owner to ensure that the work did not inconvenience neighboring labs or cause any safety issues.

]]>
UCSF Osher Building /projects/osher-building/?utm_source=rss&utm_medium=rss&utm_campaign=osher-building Thu, 07 Aug 2014 22:05:35 +0000 /?post_type=projects&p=186 Design-build delivery of a five-story, 48,000 SF building to house two major UCSF groups: the Osher Center for Integrative Medicine and the UCSF Medical Center Division of General Internal Medicine. The building program includes clinical examination and consultation rooms, reception areas, administrative offices, research space, and conference and meeting rooms. The project received LEED Gold certification.

]]>
UC Berkeley Silver Lab /projects/uc-berkeley-silver-lab/?utm_source=rss&utm_medium=rss&utm_campaign=uc-berkeley-silver-lab Fri, 26 Jan 2024 22:52:01 +0000 /?post_type=projects&p=3421 The Silver laboratory building, located in the hills above the UC Berkeley campus houses the UC Space Sciences program. The 44,900 SF academic facility contains wet and dry labs, computer labs, offices, a library, and a high bay manufacture area. 中文字幕AV replaced the entire fa莽ade including EIFS, windows, curtain wall systems, louvers, and building entrances. This phased project was completed while the building remained fully occupied without interruption to university teaching and research.

]]>
UC Berkeley Weill Hall /projects/uc-berkeley-weill-hall/?utm_source=rss&utm_medium=rss&utm_campaign=uc-berkeley-weill-hall Fri, 17 Mar 2023 00:43:38 +0000 /?post_type=projects&p=2912 In 2021, 中文字幕AV removed the sixth floor laboratory drains and associated piping and installed new, larger floor sinks, polypropolynene piping, and resinous flooring in UC Berkeley’s Department of Molecular & Cell Biology at Weill Hall. This project included the demolition of existing laboratory equipment and installation of new equipment. Each of the 12 phases consisted of the relocation and re-housing of research animals to allow for the construction and renovation of the facility, which required close coordination with the end users and researchers.

 

中文字幕AV returned two years later to renovate the facility’s basement, first, and second floors. The basement renovation consisted of modifications to the layout and finishes in several animal housing areas as well as the installation of four new fan coil units with associated chilled water piping. The first and second floor renovation consisted of the construction of a new building entrance with a two-story decorative metal panel system above a new canopy and storefront, new finishes at multiple lab entries, full lobby refurbishment on both floors, and updated finishes throughout the corridors, restrooms, and in multiple conference rooms and offices. 中文字幕AV self-performed soft demolition, finished carpentry, rough framing, and drywall.

]]>